Examples are hydropower developments at non-powered dams, in drinking water networks or in artificial waterways and canals. Hoidden hydro is also referring to increasing the output of existing hydropower schemes by various types of upgrades or enhanced operation, e.g. by using headrace tunnels as active storage. Task 16 is also looking at small decetralized pumped storage making use of existing reservoirs.
Latest News
Participation
+41 58 606-88-39
Rue de l’Industrie 23
1950 Sion, Switzerland
+43 664 2429748
Ferdinand-Raunegger-Gasse 26
9020 Klagenfurt
Austria
+41 58 465-36-23
Muehlestrasse 4, CH-3063 Ittigen
Postal address: CH-3003 Bern
+81-3-3201-6601
Otemachi Bldg. 7F, 1-6-1 Otemachi,
Chiyoda-ku, Tokyo 100-8126
Publications
Improving Performance from Existing Hydropower Facilities
Participants
Contact
+41 58 606-88-39
Rue de l’Industrie 23
1950 Sion, Switzerland